XS Cooler - Xinsheng Heat Exchanger | Industrial Heat Exchanger Manufacturer
鉱山用ダンプトラック冷却システムアップグレード
鉱山・重機

鉱山用ダンプトラック冷却システムアップグレード

課題

高い周囲温度と極端な粉塵条件により、150トンダンプトラックで頻繁な過熱と計画外停止が発生

私たちのソリューション

粉塵耐性を強化し、気流設計を最適化したカスタムプレートフィンモジュラー冷却パック

主な成果

  • 冷却能力30%向上
  • サービス間隔を500時間から2,000時間に延長
  • 計画外停止50%削減

Project Background

A leading mining equipment manufacturer approached XinSheng with a critical challenge: their 150-ton haul trucks were experiencing frequent overheating events in high-altitude, hot-climate mining operations. The existing cooling system was unable to cope with ambient temperatures exceeding 45°C combined with extreme dust conditions.

The Challenge

Operating Conditions

  • Ambient temperatures: 40-50°C
  • Altitude: 3,500m above sea level
  • Dust levels: Extreme (open-pit copper mine)
  • Operating hours: 20+ hours per day
  • Engine power: 1,800 kW

Problems Encountered

The original cooling system suffered from:

  1. Rapid fin clogging due to fine dust particles
  2. Insufficient heat rejection at high altitude
  3. High fan power consumption (15% of engine power)
  4. Frequent maintenance requirements (every 500 hours)

Our Solution

Engineering Approach

XinSheng’s application engineering team conducted detailed analysis including:

  • CFD simulation of airflow through the cooling module
  • Thermal performance modeling at altitude conditions
  • Fin geometry optimization for dust resistance
  • Fan selection and noise optimization

Design Features

Optimized Core Design

  • Wider fin spacing (10 FPI vs. standard 14 FPI) for improved cleanability
  • Enhanced turbulator patterns for better heat transfer
  • Single-row core arrangement for easy access

Modular Construction

  • Radiator + CAC + hydraulic oil cooler in integrated module
  • Quick-disconnect connections for field serviceability
  • Corrosion-resistant materials and coatings

Improved Airflow

  • Optimized shroud design reducing air-side pressure drop by 25%
  • Variable-speed fan control integration
  • Reduced recirculation with improved sealing

Results

After 12 months of field operation:

MetricBeforeAfterImprovement
Cooling CapacityBaseline+30%Significant
Service Interval500 hrs2,000 hrs4x longer
Unplanned DowntimeBaseline-50%Major reduction
Fan Power15% of engine10% of engine5% savings

Customer Testimonial

“The XinSheng cooling module has transformed our operation. We’ve seen a dramatic reduction in heat-related downtime, and our maintenance costs have dropped significantly. The engineering team’s understanding of our operating conditions was exceptional.”

— Mining Equipment OEM, Project Lead

Products Used

This project utilized the following XinSheng products:

  • Modular Cooling Pack - Integrated radiator, CAC, and oil cooler assembly
  • Bar & Plate Oil Cooler - High-pressure hydraulic system cooling
  • Tube & Fin Engine Radiator - Primary coolant system

Applicable Industries

This solution approach is applicable to:

  • Open-pit mining operations
  • Quarry equipment
  • Large construction machinery
  • Any high-temperature, dusty environment

Next Steps

Interested in similar solutions for your application? Contact our engineering team to discuss your specific requirements.

業界

Mining & Heavy Equipment

同様の課題をお持ちですか?

当社のエンジニアが熱管理の問題解決をお手伝いします。

お問い合わせ
問合せ WhatsApp